This project involved the development of a road design model in accordance with engineering requirements, with a strong focus on accuracy and compliance. The work included detailed modelling of the proposed junction layout, along with thorough checking of alignments and surface falls to ensure the design met required standards and performed effectively in terms of drainage and geometry.
New Museum of London, General Market Roof
The work involved creating a 3D model of the General Market roof for the new […]
see project