The work consisted of modelling the specialist pipework systems supplying laboratory gases within a university science building. The pipework required precise routing and coordination within a complex building environment.
Daily interaction with the design team was necessary, as the building was being constructed while the model was being developed. This ensured that the model remained fully aligned with ongoing design updates and site conditions.